Thursday 1 September 2016

Salakarai - Layout Works Re Start!

Problem : Pre Cast Compound Wall Re Work - Without Beam / Column & Footing:

Lack of proper footing / Pile Foundation make the compound posts & slabs (Ready Made-Pre Cast) tilt & fall down on sand low lying side

Rectification Method:


  1. 6' Depth hole with size 1'x1' to be made
  2. 10mm rods 4nos to be fixed in it
  3. 06mm rods to be used for stirrups @ 8" interval
  4. Upto 4' depth RCC to be done (3/4 Jally, Sand & Cement)
  5. Balance 2' on top must be kept open for Ready Made Post erection inside 4 rods & then RCC to be done 
  6. Every 10' Compound Post must be joint free 
  7. Continuous compound walls makes crack in joints & not advisable 
  8. Labour for pile foundation Rs70 per feet upto 6' = Rs420/hole

Real Estate Market trend & Agricultural Lease Rates :

  1. Othakundu Surrounding Land have a tag rate of Rs115000/- per cent 
  2. Saibaba Temple near lands on main road is offerred @ Rs2 lac per cent
  3. Beetel Nut Lease is around Rs300 per cent - 3 years
  4. Banana Rs150/- to Rs200/- per seepu is being sold 
  5. Well deepening works Mr jayaram of Melakkal is an expert
  6. Bore Well upto 300' with 8" pipe for 20' will get 2" water supply, Busget Rs30000/- approx
  7. Open Well Deepening work INSURANCE is must & Safe
  8. Solavandan Railway gate near bridge work started & within 2 years its completion will make road expansion & traffic improvement 
  9. Om Sakthi Nursery Mr Murugesan Alias Paneer has tractor poluging (5,7,9 kalappai) for Rs1700 per acre
  10. Local Body Elections by October 2016- Solavandan / Tiruvedagam are Reserved Constituencies for SC, this time Lady candidate will be nominated 