Fact File :
- 1970 Constrcucted Building (Ground Floor)
- Later in 1983 approx Extensive Renovation & additions to the existing structure done
- Year 2002 again complete renovation - Painting, Press Tiles relaying, Madras Ceiling Crack Inverted Beam support provided
- Year 2013 Painting and exterior cracks in walls & roof joints (Below Parapat Wall) chemical crouting done
- Year 2016 - At Present weakened walls plastering removed & chemical added cement mortar new plastering done!
Toilet Inner wall Dampness & crack due to water leak |
Water Spread to Ceiling & affected Roof Rods with Erosion |
Exterior Walls Cracks made water entry is now chipped & replastering done |
Toilet Exterior wall fully old plaster removed & re plastering done |
Parapet wall Horizontal Joints Crack repairing done |
Sunshades Chipped, Repaired, plastered with Slope Press Tile to block water entry/leak |
Tree Branches main cause for Wal /Sunshade Dampness Cross Section of Repairing work completed areas |